Previous-Mobile-Cabin-Plans-Prices48x20ft-EcoLodge-Derbyshire

TwinSizeMobileHomeCabins-Derbyshire

 

£107,000 

SPECIFICATION

 

Frame Materials

 

 

Structural timber to be Scandinavian softwood from sustainable sources

YES

Timber treated with preservative in accordance with BS 5268

YES

All Structural timber and wood based products will be FSC/PEFC certified

YES

 

External Wall Panels

 

 

38 x 140mm Timber Studs and 600mm max centres

YES

9mm OSB (orientated strand board) external sheathing

YES

External Breather membrane to BS4016 1966

YES

Secondary Internal Cold Bridging Stud to comply with Code 3 as determined by engineer.

YES

 

Internal Wall Panels

 

 

38 x 89mm Timber Studs and 600mm max centres

YES

Plasterboard and Service Noggins

YES

 

Chassis and Floor

 

 

NORMAL DOMESTIC LOADING

YES

45 x 240mm Floor Joists at 600mm centres

YES

22mm Chipboard (OSB) Topside Floor boarding

YES

 

Structural Roof Components

 

 

The roof construction will comprise 45x240mm Metal Web Roof Joists supporting 18mm OSB deck or other if specified by engineer to comply with Building Regulation Approval  and/or clients requirements for a ‘Grass-Roof’ to be fitted.

 

YES

 

Roof Finish

 

 

EPDM Rubber Roof suitable for later application of Grass Sedum by others

YES

Soffit and Fascia

 

Timber Clad to match external cladding

YES

Rainwater Goods

 

Powder Coated Aluminum

YES

 

External Cladding

 

 

Fixing Battens 25x50mm

YES

Timber – Cedar (unfinished) T&G 125x19mm

YES

 

External Windows and Doors (Double-Glazed)

 

 

Aluminum Clad External Finish, Softwood frame and internal finish

YES

 

Insulation

 

 

The roof will be insulated with 120mm phenolic insulation.

 

YES

The floors will be insulated with 100mm phenolic insulation

YES

External walls will be insulated with 150mm Glass-wool insulation with a second skin of 25mm phenolic insulation.

 

YES

Internal walls will be insulated with 100mm Glass-wool insulation.

 

YES

All to comply with Code 3 Building Regulation requirements.

 

YES

 

Internal Lining and Wall Finish

 

 

12mm Plasterboard

YES

12mm Moisture resistant Plasterboard for bathrooms

YES

Plaster Skim

YES

Decorating: Walls, Skirting -Painted in choice of colour

YES

Cladding to one internal living room wall (unfinished).

YES

 

Electrics

 

 

1st Fix Electrics

YES

2nd Fix Electrics

YES

Supply and connect 17th edition consumer unit to current regulations

YES

Switches and Sockets – standard white

OPTION

Switches and Sockets  – white or chrome – low profile, dimmer

OPTION

Twin/Single Sockets

15

Light Switches

10

Spotlights – Adjustable, LED

30

Pendant Lights

-

External Lights, inc Switches LED

12

External Twin Sockets

2

Bathroom / Kitchen Extractor Fans

YES

Smoke Alarms

YES

Kitchen – Spur, Cooker Controller

YES

TV Sockets

YES

 

Plumbing

 

 

1st Fix Plumbing

YES

2nd Fix Plumbing

YES

Commission Test

YES

Central Heating – Gas/Oil

 

Combination Boiler – LPG (for stored or bottled gas) + secondary pump.

YES

Radiators (water filled) – standard white

(as per engineers requirements)

YES

Fitting of supplied wood burning fire.   Supply Flue and related items.

YES

 

Toilet and Bathroom

 

 

Master Bathroom: Toilet, Sink, Bath with Shower + Chrome Screen. All standard white. Choice of taps.

YES

Toilet – Toilet and Sink.

YES

Travertine Natural Stone Tiles – Floor, bath surround and splash-back

YES

Radiator / Towel Rail – Wall Mounted Chrome

YES

Shaver Socket / Console Light

YES

 

Kitchen

 

 

Fitted Kitchen, Worktop and Units, Sink, Cooker, Oven – Choice of 50+

YES – £5000

Budget

White Goods – Fridge, Freezer, Dishwasher

NO

Ceramic or Stone Tile Surrounds

YES

Kitchen related electrics

YES

 

Internal Carpentry

 

 

Skirting and Door Surrounds – Oak

YES

Internal Doors – Oak Veneered in choice of styles

YES

Fitted Bedroom Wardrobes – Doors Only (matching internal doors)

YES

 

Floor Finish

 

 

11mm Real Wood Engineered Flooring Throughout – 3mm Oak Veneered

YES

 

Delivery / Service Connections

 

 

Delivery of materials to site

YES

Scaffolding (if required)

YES

Site Toilet / Site Office

YES

Waste Removal

YES

 

Service Connection (local)

 

 

Local Service Connections, within 2m of Slab

YES

Connect Internal Gas Pipes (provided) to External LPG or Mains Supply Box (excluded)

YES

Connect Soil Waste Pipe (provided) to Foul (provided)

YES

Water Main Connection

YES

 

External Works

 

 

Integrated Decking – Anti-slip Softwood

YES

Lighting to Decked Area

YES